Our Process An Interactive Experience It all starts with this A Fresh module from Eagle Builders Then Steel Framing is put in place Plumbing and Electrical has also begun during this stage. Next the walls are Drywalled mudded, taped and painted And air conditioning is installed Then Wall vinyl is applied Carpets and flooring are put in after After that, Plumbing and Electrical finishing is added. Even furniture is put in before shipping. Then the 100% finished module is shipped to the worksite. Once the Modules are lowered into place, Hallways and roofs are constructed Back to Top